Pg 603 - Q4

First convert the number of posters per hour to number of posters per minute.
 4200 per hour = 4200 / 60 = 70 per minute
Now divide the total number of posters to be made (840) by the rate at which they are made (70):
 840 / 70 =12 (D)
 

Back to Answer Sheet